NEWS

You want to know more about the crusher knowledge, technology, news,Cone Crusher news,jaw crusher news,sand making machine news,We offer you free line configuration。

Installation points of the five major components of the gyratory crusher

Time:2025-06-03 09:48:47 Share To

If you need our products,you can leave your contact informaction,our sales manager will send more information and quotation to you! Our email: sales@zxcrusher.com, WeChat/whatsapp:+8613676922906.

  1. Inst ation of the lower frame

  The inst ation of the lower frame is the basis for the inst ation of the equipment. First, inst the lower frame on the foundation. The equipment and the foundation should be consistent during inst ation. Due to the secondary grouting, a gap of no less than 30mm should be kept between the base of the lower frame and the foundation. Tighten the anchor bolts after the secondary grouting to ensure the stability of the equipment.

  2. Inst ation of the transmission part

  The inst ation of the transmission part is related to the operation of the equipment. Therefore, during inst ation, it is necessary to pay attention to the fact that the centers of the two copper sleeves should always be kept on the same horizontal line without deviation. The radial clearance between the copper sleeve and the shaft should also be strictly kept within a certain range according to the instructions of the equipment manual. When inst ing the transmission shaft, it is necessary to add an appropriate amount of gaskets between the flange of the transmission housing and the frame to adjust the position of the bevel gear to meet the product design requirements.

  3. Inst ation of the eccentric shaft sleeve. Special attention should be paid to the inst ation process to protect the smoothness and integrity of the friction surface of the babbitt oy layer. Check whether the tooth * clearance meets the requirements after inst ation. If abnormalities are found, they should be corrected in time. The size of the gap can be adjusted by changing the number of adjustment gaskets.

  4. Inst ation of the middle frame The inst ation of the middle frame needs to be calibrated through the upper flange of the lower frame. Before inst ation, make sure that the gaps between the flanges where cones are in contact are equal, and the error should be less than 0.5mm. The gap between the upper and lower joint surfaces is gener y about 15mm. During inst ation, make sure that the pins are tightened. After the machine has been running under load for a period of time, tighten the pins one by one again to make the pins on the circumference bear force evenly, strengthen their stability, and ensure the normal operation of the equipment.

  5. Inst ation of the crushing cone and the crossbeam There are two ways: (1) Inst ation of the crushing cone separately Use the lifting ring on the shaft to lift the crushing cone into the frame, then place wooden pads on the ribs at the bottom of the frame to support the cone, then inst the crossbeam, and inst the nut and jacket on the upper end of the main shaft, and fin y inst the cap, and then remove the wooden pads and wooden wedges. (2) Inst the crushing cone and the crossbeam together. Inst the crossbeam and the crushing cone in a special pit in advance, and then inst them together in the frame. When lifting the crushing cone and crossbeam assembly, pay attention to the lifting method. It be hung on the crossbeam with a wire rope to prevent accidents during the lifting process. The crushing w of the crushing cone be pressed tightly to prevent loosening. Before pressing, apply dry oil to the lower space of the fixing ring (pressing plate) and the matching bolts to prevent rust or corrosion, which will affect the life of the equipment.

Related MaterialsMORE+

Related CaseMORE+

Contact Form

Email: sales@zxcrusher.com, Phone: 0086-371-67660555, Whatsapp/Wechat:+86-13676922906, Skype:zxcrushers@outlook.com
Please feel free to give your inquiry in the form below. We will reply you in 24 hours

Your Name:
*E-mail:
Your Tel:
Country:
Capacity(t/h):
Instant Messenger:
Message:
Copyright:JIAOZUO CITY XINHAI MINE MACHINERY EQUIPMENT PLANT(GENERAL PARTNERSHIP) XML HTML